Silverwood: Full Exterior Rehab


The Challenge
We gave this beautiful property a much needed face lift! Check out how well it turned out below:
Notes:
Prep work is essential to ensure durability. If you do not take the time up front to prep & prime the surfaces properly, then you run the risk of having adherence issues when you go to paint the final product. This could lead to costly delays that eat up your rehab budget.

The Solution
Project Scope:
- Replaced damaged trim, fascia and siding
- Re-built patio fences
- Fully primed siding before final paint coat
- Total buildings: 13
- Total units: 208
The Impact
These photos show the project work and key steps in the process.